STEALTH PREP STATION
Stealth Prep-Station
Full-Down Airflow
The Stealth Prep pulls fresh clean air from the upper fully filtered ceiling and exhausts air down air through the fully filtered floor plenum providing a safe environment and a supreme air flow for a great paint job. The prep station is available in multiple length, width and height options to suit any shop layout. The structure can be freestanding, with structural steel supports, or suspended from your shop ceiling. Concrete work is required for the Stealth Full Down Prep Station
Booth Highlights
Heavy Duty Construction:
Construction: All of our single wall prep stations are made with premium 18 ga. Zinc galvanized steel panels, companion flanged and pre-punched at 6" on center for easy assembly with 1/4" nuts and bolts. Single Wall. Better airflow, lighting, and strength because of gabled roof design. TOP-Designed to meet the requirements of EPA’s 6H Paint Rule (40CFR63 Subpart HHHHHH), RGI’ Prep station provides a controlled environment for sanding, priming and limited painting. When priming and painting, the amount of material sprayed shall not exceed one gallon in an eight-hour period.
Fans & Motors:
(1) 34" Dia.Tube-axial fan with aluminum spark-proof blades belt drive exhaust fan 16,000 CFM
(1) 7.5PH 3ph Belt-drive motor 208-230/460v. 60 hz
Filters:
(2) Exhaust filters w/ (2) exhaust filter grids Note: Optional for extra filter exhaust Rolls
(4) Intake filter pads 37” x 117” x 2” Ceiling Diffusion Media is a 1” thick, scrim backed
Curtains:
Tri-color curtain with hardware system on 10' straight track & two-wheel nylon roller
Lighting:
Full booth LED (Standard) 4’ Long, 4 tube LED T8 light fixtures 120v. ETL listed
Heating:
Ask about our heating options